The project is located west of Mirpur Zoo (Beribandh) and southwest of the Uttara 3rd Project/Metro Rail starting station. ֍ Flood-free area with original red soil ֍ 300-foot bypass to the west (proposed) ֍ Educational zone nearby ֍ 3–10 katha plots ֍ 9–18 lakh taka per katha (current) ֍ 25 to 60-foot wide roads ֍ Installment / one-time payment facilities available.